Case Study

Borough of Dudley Retaining Wall

Year Built: 2010

Manufacturer: York Building Products

Installer: G&H Anderson Excavating

Owner: Borough of Dudley

Location: Dudley, PA

Contractor: G&H Anderson Excavating

Designer: ELA GRoup

Engineer: GHD

 

Borough of Dudley Retaining Wall

An old failing bridge was removed and the retaining wall was necessary to rehabilitate the stream bank and maintain the integrity of the adjacent driveway. The civil engineer specified a large precast block system for the project (in lieu of segmental blocks) because they were concerned about potential scour issues during high water events. The stream was rerouted through a large HDPE pipe during wall construction and the wall foundation area had to be dewatered continuously with a pump until the block was above the groundwater level. Geogrid and #57 stone was used for the reinforced zone of the wall. A safety fence and guide rail were placed at the top of the wall and rip-rap was placed at the base along the stream. The total wall area installed was 1,014 SF.

Construction Borough of Dudley Retaining Wall

Borough of Dudley Retaining Wall
Borough of Dudley Retaining Wall
Dudly-river-Pennsylvania-retaining-walls
Dudly-river-Pennsylvania-retaining-walls

 

Borough of Dudley Retaining Wall Before
Borough of Dudley Retaining Wall Before

 

Completed Borough of Dudley Retaining Wall

Dudly-river-Pennsylvania-magnumstone-retaining-walls-completed
Dudly-river-Pennsylvania-magnumstone-retaining-walls-completed
Dudly-river-Pennsylvania-magnumstone-retaining-walls-completed
Dudly-river-Pennsylvania-magnumstone-retaining-walls-completed